RAW MATERIALS INSPECTION

The raw materials for producing a perfect panel like paints, aluminium mill coils, adhesive film, and nonflammable core or LDPE core. We have a strict system from Receive, track and trace of all these materials to make sure there are qualified. Any defection will send back immediately to avoid any human factors like a poorly skilled workforce and unconscious and conscious incompetence.

LABORATORY TESTING BEFORE PRODUCTION

We also do extensive Laboratory testing prior to production. We test and simulate production on a micro-scale before commencing a full production run. The lab needs to test and simulate production and test the chemical property, physical property and solvent property and UV Testing to make sure in good condition to make for real production.

test1.jpg
test2.jpg
test3.jpg
test4.jpg
test5.jpg
test6

During-production Inspection

On-line production inspection by workers

test7.jpg

We selected our workers who are well trained with more than 5 years’ experience for online tracking and inspections. They track and test online production every 30 minutes. From the paints performance, the dimension and weight tolerance, the peel-off strength testing, we retain on-site all ACP samples hourly for the next step tracking purpose. In the unlikely event of a quality issue, we are then able to trace the source of the issue. Again giving you the confidence that we are managing the entire process, and seeking to always improve.

Off-line production inspection by professional inspectors

test8
test9.jpg

Also, there are well-educated background inspectors who are responsible for all export orders according to ISO 9000. They understand each customer’s individual requirement and acceptable quality limits; they analyze the potential problem and try to improve all details.

test10.jpg
test11.jpg
test12.jpg

After-production Inspection

1. Outside exposure testing
All production batch ACP samples are kept outside for 30 days under sun exposure; Alucoone inspectors test the sample every week to monitor the peel-off strength data if stable.

​

2. Peel-off strength testing under low-high temperature
Besides the on-site testing, Alucoone inspectors also inspect the same samples under high temperature (80℃) and low temperature (-40℃), Shift the same samples every two hours from cold to hot. In total 25 times to monitor the performance of the data.

​

3. Sample record room
All the above testing samples and technical data kept in data room for 10 years based on our guarantee times. All-purpose for tracking and inspection is to limit the risk of any de-lamination future and trace after production.

test13.jpg
document1.jpg
document2

Pre-shipping Inspection

1. Every panel must be flattened and checked again before packing to make sure there is unexpected bending to ensure we know the real status of each sheet before packing.

package3.jpg
package1.jpg
package2.jpg

2. Every package for products must be followed strictly accordingly to clients standard. From package firmness, seaworthy, ease to uploading.

package4.JPG
package5.jpg
  • Facebook
  • Twitter
  • YouTube
  • Pinterest
  • Tumblr Social Icon
  • Instagram

Copyright © 2020 Zhejiang Zhongbang New Metal Materials Co., Ltd.ALUCOONE® Metal Composite Panel. All rights reserved.

bottom of page